We are not going to print a price per foot and call it useful. Here is what actually moves the number on a bulkhead estimate, so you can read one properly.

Every contractor’s website in this industry either hides pricing entirely or prints a per-foot range wide enough to be useless. Neither helps you. What does help is understanding the variables, because then you can read competing estimates and see which ones have quietly left something out.

The variables that actually move the number

Length of wall. The obvious one, and the one with the least surprise in it. There are economies of scale — mobilisation is spread over more feet.

Retained height. How much soil the wall holds back drives everything structural: section selection, embedment depth, tieback spacing. Height affects cost more than length does, foot for foot.

Soils. What is behind and under the wall determines embedment and anchor design. Soft or organic layers mean deeper work. This is also where unknowns live, which is why soils get investigated rather than assumed.

Surcharge behind the wall. A lawn is the cheap case. A driveway, pool deck, patio or structure near the top of the slope adds load the wall must resist, and that shows up in the engineering and the price. It is the single most common reason one estimate is higher than another on apparently identical walls.

Material. Timber is generally lowest initial cost, vinyl in the middle, concrete highest. The ranking by cost over a long ownership is often different from the ranking by cost today.

Access. This surprises people more than anything else on the list. If a machine can reach the shoreline, work proceeds efficiently. If the only route is a narrow side yard, through a neighbour’s property, over a septic field, or by barge, the cost of getting equipment to the work can rival the cost of the work. Water access on a barge is sometimes the cheapest option and sometimes the most expensive — it depends on draft, tide and what is in the way.

Demolition. Removing an old wall costs real money. Avoiding it by building in front of the existing structure is often the largest single saving available on a replacement, where the site and the permits allow it.

Permitting. Agency review has fees and takes time. Scope that triggers more review costs more. Permitting is a line item worth having explicitly in the estimate rather than discovering later.

Restoration. Irrigation, landscaping, lighting, hardscape and grading in the work corridor. Ask whether restoration is in the price.

Tie-ins. Where the wall meets a neighbour’s structure, an existing dock, or a boat ramp, the detail at the junction takes time and sometimes coordination.

How to compare estimates properly

Ask every bidder, in writing:

  1. What is the design embedment, and what is it based on?
  2. What is the tieback spacing, what are the anchors, and how is the hardware protected against corrosion?
  3. What is the drainage and filter detail behind the wall?
  4. Is permitting included, and whose name is on the application?
  5. Is demolition and disposal included?
  6. Is restoration of landscaping, irrigation and grade included?
  7. What is the warranty, and on what — materials, workmanship, or both?

An estimate that cannot answer those is not a lower price for the same thing. It is a price for a different thing.

Repair is usually the cheaper question

If your wall is structurally sound and losing soil through its joints, repair — grout injection and void filling — is a fraction of replacement cost. The trap is that soil loss compounds: the longer the void grows, the larger the repair, until eventually the cheap fix is no longer available. Timing is most of the economics here.

A marine inspection tells you which situation you are in before you start collecting prices.

Get a real number

Our estimates are free and we write them against the actual conditions on your property. Call (904) 327-3931 or request an estimate.

Frequently asked questions

Why will you not publish a price per linear foot?
Because a per-foot figure quoted without knowing retained height, soils, access and what is behind the wall is close to meaningless, and in practice it is used to win a phone call rather than to inform you. Two walls the same length on the same street can differ substantially in cost because one has a pool deck behind it and a side yard you cannot get a machine through. We will give you a real number for your property, in writing, for free.
Why is one estimate so much cheaper than the others?
Usually one of four things: the tieback design is lighter or absent, embedment is shallower, the drainage and filter detail behind the wall has been left out, or permitting has been excluded and will come back later as a change. Ask each bidder to state embedment, tieback spacing and anchor type, the drainage detail, and whether permitting is included. The cheap bid frequently stops being the cheap bid once those are equalised.
Does a new bulkhead add value to my property?
A failing bulkhead is a known deduction in a waterfront sale and will come up in inspection and financing. Beyond that, what a specific improvement does to your property's value is a question for a local appraiser or agent rather than a contractor — we are not going to invent a number.
Do you offer financing?
Contact us and ask — we will tell you what is currently available rather than leaving an outdated answer sitting on a web page.

Last reviewed October 2026 by Barefoot Marine Construction. Permit requirements and agency rules change — confirm current requirements with the reviewing agency before you plan work.

What customers say about this work

Unedited reviews from our Google Business Profile, where all 22 can be read in full.

Read them on Google
  • We recently (February 2024) had Barefoot Marine Construction build a bulkhead in our backyard by our lake. Rick, the owner, came out the same day we called him to advise. We were very happy with the crew he sent: Zach, Zeb, Sebastian, and Joshua. They were knowledgeable, courteous, did great work, and answered our questions. The price was competitive, and work was completed in a timely manner; even the cleanup was great. We recommend them highly!

    R Gilchriest

    2 years ago Google review

  • Barefoot Marine Construction recently replaced 200' of bulkhead at my home and I could not be happier with their work. After years of dreading the approach of hurricane season, I finally feel that I have the high quality protection that I need. Every component that went into my new bulkhead is bigger and stronger than the previous construction. The folks that I worked with are top-notch. They are professional, responsive, diligent and helpful. I am 100% confident in recommending Rick, Tom, Curtis and the rest of the crew.

    Positive: Responsiveness, Quality, Professionalism

    Jean Hull

    6 years ago Google review

  • We hired Barefoot Marine to rebuild our bulkhead after hearing great reviews from our neighbors who had used them. We were not disappointed. The crew were polite, friendly and cleaned up their work area every day before they left. The end result is beautiful. We highly recommend the company.

    Diane Barg

    a year ago Google review

Get a free estimate on your project

Send us a few photos and what you're seeing, and we'll tell you what it needs — repair, replacement, or just monitoring.

Certified General Contractor #1533461 · Workers' Comp + USL&H Insured · Serving Northeast Florida since 2009