Skip to content

Anastasia Island · St. Johns County, Florida

Bulkhead Construction in Anastasia Island

New bulkheads for Anastasia Island property on the Matanzas River — designed around what this shoreline actually does, not around a standard detail.

  • Matanzas River
  • Salt Run
  • Intracoastal Waterway

Barefoot Marine Construction builds and repairs the structures that hold Anastasia Island's waterfront in place. We have worked St. Johns County since 2009 — Certified General Contractor #1533461, carrying Workers' Compensation and USL&H coverage — the federally required cover for maritime work that falls outside state workers' compensation, and the one that actually applies to crews working over water.

This page is about bulkhead construction specifically in Anastasia Island, on the Matanzas River. The engineering here is not the same as it is five miles away, and an estimate written without knowing which water your property faces is a guess.

Anastasia Island at the water's edge

Before we talk about building a wall here, it is worth being clear about what a Anastasia Island bulkhead is actually holding back, and what is working against it.

Anastasia Island runs from the St. Augustine Inlet south towards Crescent Beach, with the Atlantic on the east and the Matanzas River and Salt Run on the west. River-side properties across its length are where the marine construction work is, and conditions vary meaningfully from the inlet end to the southern reaches.

Western frontage on the Matanzas and Salt Run, ranging from fully armoured in the developed northern sections to marsh and natural bank further south. The barrier island setting means salt exposure is total and the water is genuinely tidal throughout.

What the water does here

Tidal current through the Matanzas and Salt Run, strongest towards the inlet end. Boat wake from the ICW channel is a steady contributor along the length. Storm surge is a design consideration given the barrier-island exposure and the limited elevation of much of the island.

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. Tidal range is significant. That matters twice over: it drives a large volume of water in and out through any opening in a wall, and it makes a fixed-only dock awkward to board at the bottom of the tide.

Barrier-island sands with organic layers where marsh was filled, which is common in the developed sections. Depth to competent bearing varies, and filled areas behave differently from the natural ridge. For a new bulkhead that drives embedment depth and tieback design directly — the wall has to be founded past anything that will not carry load, and anchored outside the wedge of soil actively pushing on it.

Common shoreline problems in Anastasia Island

These are the conditions a new Anastasia Island bulkhead has to be designed against. Every one of them is a reason some existing wall on this stretch of Matanzas River, Salt Run, Intracoastal Waterway and Atlantic Ocean is not performing.

  • Toe scour from tidal current, more aggressive towards the inlet end of the island
  • Soil loss through joints in walls retaining filled ground
  • Overtopping and landward-side erosion during surge events
  • Marsh-edge retreat on the southern and less-developed frontage
  • Corrosion of hardware and reinforcement under full salt exposure

Building a new bulkhead in Anastasia Island

A bulkhead is the structure that holds your ground back from the water. In Anastasia Island the soils described above are what it has to be founded in, and they are the reason a wall that works on one lot can be underbuilt on the next.

The quality of the finished wall is mostly decided before anything is driven. We establish the alignment, what the soils will support, what is loading the ground behind the wall, and how equipment is going to reach the work — access varies from straightforward on the larger developed lots to constrained in the denser sections. Barrier-island lots tend to be narrow, and hardscape close to the water is common.

  • Survey and alignment, including whether building in front of an existing structure is viable
  • Soils and the embedment depth they dictate
  • Exposure assessment for Matanzas River conditions at your specific frontage
  • Surcharge from anything built near the top of the slope — driveway, pool deck, patio or structure
  • Permitting, which usually sets the schedule

How the build runs

Sheet piles driven to design embedment with interlocks engaged, tiebacks run back to deadman anchors set in undisturbed soil outside the active wedge, a reinforced concrete cap tying the pile tops together, then backfill in compacted lifts with a drainage detail that lets water out without taking soil with it.

That last detail is the one that decides whether you are calling us back in five years. The full construction sequence is here.

Choosing a material for Anastasia Island

We build in vinyl, concrete and treated timber, and we have no house favourite. Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail.

For most Anastasia Island frontage, vinyl sheet pile properly tied back is the starting point. Concrete becomes worth pricing where there is real surcharge load behind the wall. Timber is a legitimate answer where you are matching an existing structure or the exposure is low.

Seawall concerns in Anastasia Island

Whether your wall is really a bulkhead or really a seawall is a design question rather than a naming one, and on this frontage it is worth asking. River-side Anastasia frontage is genuine seawall condition, and the demand increases as you move north towards the inlet. Full detail: seawall construction in Anastasia Island and seawall repair.

Bulkhead and seawall get used interchangeably across Northeast Florida and we answer to both. The distinction that matters is which force governs the design — soil pressure or wave energy. We explain it properly here.

Dock challenges in Anastasia Island

If a dock is going in now or later, say so at design stage — the tie-in and any pile layout are far cheaper to coordinate once. The constraints on this frontage:

More at dock construction in Anastasia Island.

  • Significant tidal range with substantial exposed flats at low water in places
  • Tidal current loading piles, particularly nearer the inlet
  • Reaching navigable depth across shallow margins on the river side

What we would recommend in Anastasia Island

Putting that together for a new bulkhead on this frontage:

Treatment varies along the island, so we assess where on Anastasia a property actually sits before recommending anything. Northern, inlet-influenced frontage needs more wall than southern marsh-fringed frontage, and paying for the former on the latter is waste.

Access varies from straightforward on the larger developed lots to constrained in the denser sections. Barrier-island lots tend to be narrow, and hardscape close to the water is common.

Permit considerations for bulkhead construction in Anastasia Island

New construction is reviewed differently from a repair in place, and a wall on a new alignment differently again. Building waterward of an existing structure — often the cheapest option — has its own permitting consequences.

Barrier-island frontage, proximity to state park and conservation lands in places, and ICW navigation considerations all feature. What applies depends heavily on where along the island the property sits.

Requirements are revised periodically. Treat this as orientation and confirm current requirements with each reviewing agency before planning work. We handle permitting on the projects we build, and agency review is normally the longest item in the schedule.

Filter the full gallery by neighborhood, county and project type.

View all projects

Barefoot Marine's own job photography from across Northeast Florida.

Anastasia Island bulkhead construction questions

How much does a bulkhead cost in Anastasia Island?
For a new wall, there is no honest per-foot figure for Anastasia Island, because the variables that move the number are site-specific. The ones that matter most here: retained height, the soils (barrier-island sands with organic layers where marsh was filled, which is common in the developed sections. Depth to competent bearing varies, and filled areas behave differently from the natural ridge), whether a driveway, pool deck or structure is adding surcharge behind the wall, and access. Access varies from straightforward on the larger developed lots to constrained in the denser sections. Barrier-island lots tend to be narrow, and hardscape close to the water is common. Our estimates are free and written against your actual frontage.
How much does a seawall cost in Anastasia Island?
More than a bulkhead of the same length, because of toe protection, deeper embedment and a heavier section for wave loading. What drives it in Anastasia Island, or the general seawall cost page.
How long do seawalls last in Florida?
There is no single number — drainage, toe protection and tieback corrosion decide it far more than the material does. In Anastasia Island, full salt exposure accelerates corrosion of hardware and embedded reinforcement, which shortens the clock for any given specification. The full answer is here.
Do I need permits for a dock in Anastasia Island?
For a new wall, assume yes, and often from more than one agency. Barrier-island frontage, proximity to state park and conservation lands in places, and ICW navigation considerations all feature. What applies depends heavily on where along the island the property sits. Depending on your site and scope that can involve FDEP, the U.S. Army Corps of Engineers, the St. Johns River Water Management District, and your county or municipal building department. Requirements are revised periodically — confirm current requirements with the reviewing agency. Our dock permits page explains who reviews what, and we handle permitting on the projects we build.
Can a seawall be repaired?
Usually — repair is a fraction of replacement when the piles, embedment and tiebacks are still sound. What that looks like in Anastasia Island.
What causes bulkhead failure?
Soil loss through joints, tieback corrosion, toe scour, and chloride attack on the cap — usually several at once. How that plays out in Anastasia Island.
What is the best bulkhead material?
There is no best in the abstract — it depends on exposure, soils, what sits behind the wall and how long you plan to own the property. For most Anastasia Island frontage, vinyl sheet pile properly tied back is the starting point: it will not rot or corrode, which are the two mechanisms that end walls in this climate. Concrete earns its higher cost where there is real surcharge load behind the wall or the cap is the finished edge. Treated timber is legitimate where you are matching an existing structure.
What is the best seawall material?
Whatever the material, the section has to suit wave loading and the toe has to be protected — neither concrete nor vinyl resists scour on its own. What suits Anastasia Island.

Nearby waterfront communities

We work the whole of this stretch. Conditions change between these communities — sometimes a lot.

Last reviewed November 2026 by Barefoot Marine Construction. Permit requirements and agency rules change — confirm current requirements with the reviewing agency before planning work.

Bulkhead Construction in Anastasia Island — free estimate

We work St. Johns County waterfront from our base in Jacksonville. Tell us what you are seeing and we will tell you what it needs.

Certified General Contractor #1533461 · Workers' Comp + USL&H Insured · Serving Northeast Florida since 2009