Seawall Construction in Anastasia Island

Seawalls built for the energy of Anastasia Island's frontage on the Matanzas River.

  • Matanzas River
  • Salt Run
  • Intracoastal Waterway

Barefoot Marine Construction builds and repairs the structures that hold Anastasia Island's waterfront in place. We have worked St. Johns County since 2009 — Certified General Contractor #1533461, carrying Workers' Compensation and USL&H coverage — the federally required cover for maritime work that falls outside state workers' compensation, and the one that actually applies to crews working over water.

This page is about seawall construction specifically in Anastasia Island, on the Matanzas River. The engineering here is not the same as it is five miles away, and an estimate written without knowing which water your property faces is a guess.

Anastasia Island at the water's edge

A seawall is designed around the energy it absorbs, so the design starts with the water rather than with the wall.

Anastasia Island runs from the St. Augustine Inlet south towards Crescent Beach, with the Atlantic on the east and the Matanzas River and Salt Run on the west. River-side properties across its length are where the marine construction work is, and conditions vary meaningfully from the inlet end to the southern reaches.

Western frontage on the Matanzas and Salt Run, ranging from fully armoured in the developed northern sections to marsh and natural bank further south. The barrier island setting means salt exposure is total and the water is genuinely tidal throughout.

What the water does here

Tidal current through the Matanzas and Salt Run, strongest towards the inlet end. Boat wake from the ICW channel is a steady contributor along the length. Storm surge is a design consideration given the barrier-island exposure and the limited elevation of much of the island.

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. Tidal range is significant. That matters twice over: it drives a large volume of water in and out through any opening in a wall, and it makes a fixed-only dock awkward to board at the bottom of the tide.

Barrier-island sands with organic layers where marsh was filled, which is common in the developed sections. Depth to competent bearing varies, and filled areas behave differently from the natural ridge. For a seawall it drives section selection, how much toe protection the wall needs, and where the cap has to sit to limit overtopping.

Common shoreline problems in Anastasia Island

A new seawall on Matanzas River, Salt Run, Intracoastal Waterway and Atlantic Ocean has to answer all of these. The ones involving scour and overtopping are the ones most often left out of a cheap design.

  • Toe scour from tidal current, more aggressive towards the inlet end of the island
  • Soil loss through joints in walls retaining filled ground
  • Overtopping and landward-side erosion during surge events
  • Marsh-edge retreat on the southern and less-developed frontage
  • Corrosion of hardware and reinforcement under full salt exposure

Designing a seawall for Anastasia Island conditions

A seawall is designed around the energy it has to absorb, and that is why we will not quote one by the foot over the phone. Tidal current through the Matanzas and Salt Run, strongest towards the inlet end. Boat wake from the ICW channel is a steady contributor along the length. Storm surge is a design consideration given the barrier-island exposure and the limited elevation of much of the island.

On Anastasia Island frontage that drives four things: the section selected, how deep it is embedded, whether toe protection is needed and how much, and where the top of the wall sits relative to design water levels.

  • Fetch and wake exposure specific to your frontage on the Matanzas River
  • Embedment depth, with an allowance for scour rather than for soil load alone
  • Toe protection sized for the energy the wall will reflect back into the water
  • Cap elevation and freeboard, set to limit overtopping
  • Tieback spacing and anchor placement outside the active soil wedge

Toe protection is the detail that decides it

A vertical wall reflects wave energy downward into the water at its own base, and that reflected energy excavates the material the wall is embedded in. The wall undermines its own foundation, continuously, and none of it is visible from the top.

River-side Anastasia frontage is genuine seawall condition, and the demand increases as you move north towards the inlet. Toe protection is warranted, embedment should allow for scour, and cap elevation should reflect that surge on a barrier island is a design case rather than an outside chance.

If you are comparing estimates for Anastasia Island and one of them has no toe protection on exposed frontage, that is the question to ask before you compare the totals.

Materials for this water

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. We build vinyl and concrete seawalls, and the choice turns on exposure, what sits behind the wall, and how long you intend to own the property.

The important qualifier for vinyl is that wave loading is a larger demand than soil retention, so the section has to be selected for it. A profile adequate on sheltered water is not automatically adequate here. The full construction process is here.

Bulkhead concerns in Anastasia Island

A new seawall here is also a soil-retaining structure, so the bulkhead side of the problem does not go away. Anastasia Island bulkheads are typically retaining filled ground on a barrier island, which means organic layers under the fill and limited cohesion in the retained material. Full detail: bulkhead construction in Anastasia Island and bulkhead repair.

Dock challenges in Anastasia Island

A new wall is the natural moment to resolve a dock tie-in properly rather than working around it. The constraints on this frontage:

More at dock construction in Anastasia Island.

  • Significant tidal range with substantial exposed flats at low water in places
  • Tidal current loading piles, particularly nearer the inlet
  • Reaching navigable depth across shallow margins on the river side

What we would recommend in Anastasia Island

Putting that together for a new seawall here:

Treatment varies along the island, so we assess where on Anastasia a property actually sits before recommending anything. Northern, inlet-influenced frontage needs more wall than southern marsh-fringed frontage, and paying for the former on the latter is waste.

Access varies from straightforward on the larger developed lots to constrained in the denser sections. Barrier-island lots tend to be narrow, and hardscape close to the water is common.

Permit considerations for seawall construction in Anastasia Island

A new seawall is reviewed as new construction, and the toe protection it needs is part of the proposal rather than an afterthought added later.

Barrier-island frontage, proximity to state park and conservation lands in places, and ICW navigation considerations all feature. What applies depends heavily on where along the island the property sits.

Requirements are revised periodically. Treat this as orientation and confirm current requirements with each reviewing agency before planning work. We handle permitting on the projects we build, and agency review is normally the longest item in the schedule.

Filter the full gallery by neighborhood, county and project type.

View all projects

Barefoot Marine's own job photography from across Northeast Florida.

Anastasia Island seawall construction questions

How much does a bulkhead cost in Anastasia Island?
It depends on retained height, soils, what is loading the ground behind the wall, and how equipment reaches the water — and in Anastasia Island, access is a genuine swing factor. Full breakdown for Anastasia Island, or the general bulkhead cost page. Estimates are free.
How much does a seawall cost in Anastasia Island?
Designing a new seawall, a seawall generally costs more than a bulkhead of the same length on the same site, because it carries work the bulkhead does not: toe protection sized for the exposure, deeper embedment with a scour allowance, and a heavier section for wave loading. On Anastasia Island frontage, moderate exposure — not extreme, but persistent enough to matter over a structure’s life, which is what drives that difference. Demolition of an existing wall and permitting are the other two line items worth stated explicitly rather than discovered later.
How long do seawalls last in Florida?
Designing a new seawall, the answer is a range rather than a number — two walls built the same week in the same material can be decades apart. What decides it: toe protection and whether scour was allowed for, drainage behind the wall, corrosion protection on the tieback hardware, and whether anyone has looked at it in the last five years. In Anastasia Island specifically, full salt exposure accelerates corrosion of hardware and embedded reinforcement, which shortens the clock for any given specification. More on what actually determines it.
Do I need permits for a dock in Anastasia Island?
Yes, and usually from several agencies at once. Barrier-island frontage, proximity to state park and conservation lands in places, and ICW navigation considerations all feature. Dock permitting in Anastasia Island, or who reviews what. Confirm current requirements with the reviewing agency.
Can a seawall be repaired?
Usually — repair is a fraction of replacement when the piles, embedment and tiebacks are still sound. What that looks like in Anastasia Island.
What causes bulkhead failure?
Soil loss through joints, tieback corrosion, toe scour, and chloride attack on the cap — usually several at once. How that plays out in Anastasia Island.
What is the best bulkhead material?
No single best — for most Anastasia Island frontage, tied-back vinyl is the starting point, with concrete where surcharge load is real. Material choice for Anastasia Island.
What is the best seawall material?
The same honest answer, with one addition specific to seawalls: whatever material you choose, the section has to be selected for wave loading rather than for soil retention, and the toe has to be protected. Anastasia Island frontage sees moderate but persistent energy, so this matters over the life of the wall rather than on any single day. Concrete brings mass and stiffness; vinyl cannot corrode. Neither protects against scour on its own.

Nearby waterfront communities

We work the whole of this stretch. Conditions change between these communities — sometimes a lot.

Last reviewed November 2026 by Barefoot Marine Construction. Permit requirements and agency rules change — confirm current requirements with the reviewing agency before planning work.

Seawall Construction in Anastasia Island — free estimate

We work St. Johns County waterfront from our base in Jacksonville. Tell us what you are seeing and we will tell you what it needs.