Skip to content

Camachee Island · St. Johns County, Florida

Bulkhead Construction in Camachee Island

New bulkheads for Camachee Island property on the Tolomato River — designed around what this shoreline actually does, not around a standard detail.

  • Tolomato River
  • Intracoastal Waterway
  • St. Augustine Inlet

Barefoot Marine Construction builds and repairs the structures that hold Camachee Island's waterfront in place. We have worked St. Johns County since 2009 — Certified General Contractor #1533461, carrying Workers' Compensation and USL&H coverage — the federally required cover for maritime work that falls outside state workers' compensation, and the one that actually applies to crews working over water.

This page is about bulkhead construction specifically in Camachee Island, on the Tolomato River. The engineering here is not the same as it is five miles away, and an estimate written without knowing which water your property faces is a guess.

Camachee Island at the water's edge

Before we talk about building a wall here, it is worth being clear about what a Camachee Island bulkhead is actually holding back, and what is working against it.

Camachee Island is a compact waterfront community built around Camachee Cove Yacht Harbor, just inside the St. Augustine Inlet on the Tolomato River. It is a boating address first and foremost — the marina is the organising feature, and most properties here were bought with vessel access as the primary consideration.

Frontage is largely hard-edged and purpose-built, oriented around the harbour and the channel serving it. This is one of the more engineered shorelines in the county, with less natural bank and marsh than its neighbours and correspondingly more existing structure to assess and maintain.

What the water does here

The cove itself is relatively protected, which is the point of it. Energy increases sharply towards the Tolomato and the inlet approach, where tidal current becomes a serious consideration. Properties on the outer edge of Camachee face materially different conditions from those tucked inside the harbour.

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. Tidal range is significant. That matters twice over: it drives a large volume of water in and out through any opening in a wall, and it makes a fixed-only dock awkward to board at the bottom of the tide.

Largely made ground and engineered fill associated with the development of the island and harbour, over native sands. Fill character and depth vary, and knowing what is actually under a given property matters more here than in areas with undisturbed native soil. For a new bulkhead that drives embedment depth and tieback design directly — the wall has to be founded past anything that will not carry load, and anchored outside the wedge of soil actively pushing on it.

Common shoreline problems in Camachee Island

These are the conditions a new Camachee Island bulkhead has to be designed against. Every one of them is a reason some existing wall on this stretch of Tolomato River, Intracoastal Waterway and St. Augustine Inlet is not performing.

  • Toe scour on the outer frontage where inlet-driven current runs hardest
  • Deterioration of ageing harbour-side structures built when the community was developed
  • Soil loss through joints in fill that has limited cohesion to begin with
  • Salt exposure driving corrosion in hardware and reinforcement
  • Concentrated wake and prop wash in the harbour approach

Building a new bulkhead in Camachee Island

A bulkhead is the structure that holds your ground back from the water. In Camachee Island the soils described above are what it has to be founded in, and they are the reason a wall that works on one lot can be underbuilt on the next.

The quality of the finished wall is mostly decided before anything is driven. We establish the alignment, what the soils will support, what is loading the ground behind the wall, and how equipment is going to reach the work — compact lots in an established marina community, with the practical advantage that water access is excellent and the practical constraint that land access and laydown space are limited. Coordination with harbour operations is usually part of the job.

  • Survey and alignment, including whether building in front of an existing structure is viable
  • Soils and the embedment depth they dictate
  • Exposure assessment for Tolomato River conditions at your specific frontage
  • Surcharge from anything built near the top of the slope — driveway, pool deck, patio or structure
  • Permitting, which usually sets the schedule

How the build runs

Sheet piles driven to design embedment with interlocks engaged, tiebacks run back to deadman anchors set in undisturbed soil outside the active wedge, a reinforced concrete cap tying the pile tops together, then backfill in compacted lifts with a drainage detail that lets water out without taking soil with it.

That last detail is the one that decides whether you are calling us back in five years. The full construction sequence is here.

Choosing a material for Camachee Island

We build in vinyl, concrete and treated timber, and we have no house favourite. Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail.

For most Camachee Island frontage, vinyl sheet pile properly tied back is the starting point. Concrete becomes worth pricing where there is real surcharge load behind the wall. Timber is a legitimate answer where you are matching an existing structure or the exposure is low.

Seawall concerns in Camachee Island

Whether your wall is really a bulkhead or really a seawall is a design question rather than a naming one, and on this frontage it is worth asking. Outer Camachee frontage facing the Tolomato and the inlet approach takes genuine hydraulic loading, and toe protection there is warranted. Full detail: seawall construction in Camachee Island and seawall repair.

Bulkhead and seawall get used interchangeably across Northeast Florida and we answer to both. The distinction that matters is which force governs the design — soil pressure or wave energy. We explain it properly here.

Dock challenges in Camachee Island

If a dock is going in now or later, say so at design stage — the tie-in and any pile layout are far cheaper to coordinate once. The constraints on this frontage:

More at dock construction in Camachee Island.

  • Working within an established marina environment with vessel traffic and berthing constraints
  • Strong current on the outer frontage, loading piles and scouring foundations
  • Pile penetration through variable fill to reach competent bearing

What we would recommend in Camachee Island

Putting that together for a new bulkhead on this frontage:

Camachee properties benefit from an inspection that establishes the condition of existing structures and what is under them, since so much of the shoreline is engineered and ageing together. Treatment then differs sharply between inner-harbour and outer-river frontage.

Compact lots in an established marina community, with the practical advantage that water access is excellent and the practical constraint that land access and laydown space are limited. Coordination with harbour operations is usually part of the job.

Permit considerations for bulkhead construction in Camachee Island

New construction is reviewed differently from a repair in place, and a wall on a new alignment differently again. Building waterward of an existing structure — often the cheapest option — has its own permitting consequences.

Proximity to the inlet and the ICW channel puts navigation considerations at the front of review, and work within or adjacent to an operating marina brings its own coordination requirements.

Requirements are revised periodically. Treat this as orientation and confirm current requirements with each reviewing agency before planning work. We handle permitting on the projects we build, and agency review is normally the longest item in the schedule.

Filter the full gallery by neighborhood, county and project type.

View all projects

Barefoot Marine's own job photography from across Northeast Florida.

Camachee Island bulkhead construction questions

How much does a bulkhead cost in Camachee Island?
For a new wall, there is no honest per-foot figure for Camachee Island, because the variables that move the number are site-specific. The ones that matter most here: retained height, the soils (largely made ground and engineered fill associated with the development of the island and harbour, over native sands. Fill character and depth vary, and knowing what is actually under a given property matters more here than in areas with undisturbed native soil), whether a driveway, pool deck or structure is adding surcharge behind the wall, and access. Compact lots in an established marina community, with the practical advantage that water access is excellent and the practical constraint that land access and laydown space are limited. Coordination with harbour operations is usually part of the job. Our estimates are free and written against your actual frontage.
How much does a seawall cost in Camachee Island?
More than a bulkhead of the same length, because of toe protection, deeper embedment and a heavier section for wave loading. What drives it in Camachee Island, or the general seawall cost page.
How long do seawalls last in Florida?
There is no single number — drainage, toe protection and tieback corrosion decide it far more than the material does. In Camachee Island, full salt exposure accelerates corrosion of hardware and embedded reinforcement, which shortens the clock for any given specification. The full answer is here.
Do I need permits for a dock in Camachee Island?
For a new wall, assume yes, and often from more than one agency. Proximity to the inlet and the ICW channel puts navigation considerations at the front of review, and work within or adjacent to an operating marina brings its own coordination requirements. Depending on your site and scope that can involve FDEP, the U.S. Army Corps of Engineers, the St. Johns River Water Management District, and your county or municipal building department. Requirements are revised periodically — confirm current requirements with the reviewing agency. Our dock permits page explains who reviews what, and we handle permitting on the projects we build.
Can a seawall be repaired?
Usually — repair is a fraction of replacement when the piles, embedment and tiebacks are still sound. What that looks like in Camachee Island.
What causes bulkhead failure?
Soil loss through joints, tieback corrosion, toe scour, and chloride attack on the cap — usually several at once. How that plays out in Camachee Island.
What is the best bulkhead material?
There is no best in the abstract — it depends on exposure, soils, what sits behind the wall and how long you plan to own the property. For most Camachee Island frontage, vinyl sheet pile properly tied back is the starting point: it will not rot or corrode, which are the two mechanisms that end walls in this climate. Concrete earns its higher cost where there is real surcharge load behind the wall or the cap is the finished edge. Treated timber is legitimate where you are matching an existing structure.
What is the best seawall material?
Whatever the material, the section has to suit wave loading and the toe has to be protected — neither concrete nor vinyl resists scour on its own. What suits Camachee Island.

Nearby waterfront communities

We work the whole of this stretch. Conditions change between these communities — sometimes a lot.

Last reviewed November 2026 by Barefoot Marine Construction. Permit requirements and agency rules change — confirm current requirements with the reviewing agency before planning work.

Bulkhead Construction in Camachee Island — free estimate

We work St. Johns County waterfront from our base in Jacksonville. Tell us what you are seeing and we will tell you what it needs.

Certified General Contractor #1533461 · Workers' Comp + USL&H Insured · Serving Northeast Florida since 2009