Skip to content

Davis Shores · St. Johns County, Florida

Dock Construction in Davis Shores

Docks designed around Davis Shores's depth, tidal range and permitting picture, and the boat you actually own.

  • Matanzas River
  • Salt Run
  • Intracoastal Waterway

Barefoot Marine Construction builds and repairs the structures that hold Davis Shores's waterfront in place. We have worked St. Johns County since 2009 — Certified General Contractor #1533461, carrying Workers' Compensation and USL&H coverage — the federally required cover for maritime work that falls outside state workers' compensation, and the one that actually applies to crews working over water.

This page is about dock construction specifically in Davis Shores, on the Matanzas River. The engineering here is not the same as it is five miles away, and an estimate written without knowing which water your property faces is a guess.

Davis Shores at the water's edge

Where your dock can go, how long it has to be and what it will cost are all decided by this stretch of water long before anyone draws anything.

Davis Shores sits at the north end of Anastasia Island, immediately across the Bridge of Lions from downtown St. Augustine. It is a low-lying, densely built waterfront neighbourhood on filled ground, with frontage on both the Matanzas River and Salt Run, and it has a long and well-documented relationship with high water.

Almost entirely armoured, with seawalls and bulkheads along most of the developed frontage. Low elevation relative to the water is the defining characteristic — the margin between a normal high tide and the top of many walls here is slim, and that shapes everything about how structures perform.

What the water does here

Tidal current through the Matanzas and Salt Run, boat wake from a busy stretch of the ICW, and — the dominant concern — storm surge and elevated water levels. Davis Shores is low enough that overtopping is a design case rather than a remote possibility.

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. Tidal range is significant. That matters twice over: it drives a large volume of water in and out through any opening in a wall, and it makes a fixed-only dock awkward to board at the bottom of the tide.

Filled ground over original marsh and river bottom. The organic layers beneath the fill are a central engineering fact here: they provide little resistance, and embedment has to reach past them. Settlement over time is common on properties where it did not. For a dock it decides pile length and penetration, deck elevation, and whether a floating section earns its place.

Common shoreline problems in Davis Shores

A dock shares the shoreline with whatever wall is there, so these matter even when the job is purely a dock — the shore-end tie-in is where the two structures meet.

  • Overtopping during elevated water events, eroding soil from behind walls on the landward side
  • Soil loss through wall joints into water that is moving on every tide
  • Settlement of fill over organic layers, showing as depressions and tilting hardscape
  • Toe scour where current runs along the frontage
  • Hydrostatic pressure behind walls where drainage cannot keep up during high water

Building a dock in Davis Shores

The biggest variable in any Davis Shores dock estimate is how far out you have to go to reach water deep enough to float your boat at low tide. Everything else is smaller than that, and it is why two neighbouring lots can get very different numbers.

Tidal range is significant. That matters twice over: it drives a large volume of water in and out through any opening in a wall, and it makes a fixed-only dock awkward to board at the bottom of the tide.

  • Significant tidal range in a neighbourhood with low freeboard to begin with
  • Tidal current in Salt Run and the Matanzas loading piles and scouring foundations
  • Dense development limiting the space available for structures and for construction access
  • Boat traffic on a busy stretch of the Intracoastal

What we establish before drawing anything

A good dock is a solved problem rather than a product, and the solving happens before material is ordered.

  • How you actually use the water — fishing, boarding, sitting, or a vessel on a lift
  • The boat you own now and the one you might own next, since draft sets how far out you need to go
  • Where usable depth actually is on your Matanzas River frontage at low water
  • Tidal range, which decides deck elevation and whether a floating section earns its place
  • What the permits will allow, because there is no value in designing something that cannot be built

Piles, framing and hardware

Piles are the expensive component and the one living in the worst conditions. They get driven to the penetration the loads and soils require, and on this frontage that is decided by how deep competent bearing actually sits — which is why we establish it rather than assume it.

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. In practice that means fasteners and connections are where a dock's service life is decided, not the decking you look at. It is also the part that is invisible in a finished photograph, which is exactly why it is worth asking every bidder about. More on how we design custom docks.

What goes on a Davis Shores dock

A dock is a platform, and most of what makes it worth having sits on top of it. With Davis Shores's tidal range, how these pieces sit relative to the water changes through the day, which is worth settling at design stage.

All four are cheaper and better resolved at design stage than bolted on later, because the structure and fixings can go where they are needed instead of being worked around:

  • Handrails and railings — single rail, double rail or a full guard. Under full salt exposure here, the fixings are what decide how long a rail lasts.
  • Gazebos and covered structures — shade is what makes a dock usable in July, but a roof over water is a sail. Davis Shores's moderate exposure still puts real uplift on a roof.
  • Boathouses — the largest covered structure most owners build. The piles decide whether it can go on an existing dock.
  • Custom decks — at the landward end, where filled ground over original marsh and river bottom. The organic layers beneath the fill are a central engineering fact here: they provide little resistance, and embedment has to reach past them. Settlement over time is common on properties where it did not is what the footings have to deal with.

Docks and walls go together

Most docks tie into a bulkhead or seawall at the shore end, and that junction is a detail that either gets done well or becomes a problem. If both structures need work, doing them in one project is almost always cheaper than two — one mobilisation, one permit process, one disruption.

It is worth asking about even if you were only thinking about the dock.

Bulkhead concerns in Davis Shores

A dock shares its shore end with whatever is retaining the ground behind it. Davis Shores bulkheads are retaining fill on low ground against water that regularly comes close to the top of the wall. Full detail: bulkhead construction in Davis Shores and bulkhead repair.

Seawall concerns in Davis Shores

The wall your dock ties into is doing its own job, and how exposed it is changes what that job involves. This is a neighbourhood where cap elevation and freeboard genuinely matter. Full detail: seawall construction in Davis Shores and seawall repair.

Bulkhead and seawall get used interchangeably across Northeast Florida and we answer to both. The distinction that matters is which force governs the design — soil pressure or wave energy. We explain it properly here.

What we would recommend in Davis Shores

Putting that together for a dock on this frontage:

Davis Shores properties warrant attention to the drainage and the ground behind the wall as much as to the wall itself. Void filling and grout injection are frequently the highest-value work here, because soil loss into fill over organics compounds quickly and the symptoms show up in hardscape before anyone looks at the wall.

Land access is generally workable, but lots are compact and densely developed, with limited laydown space and hardscape close to the water. Protecting and restoring what is in the work corridor is a real part of the scope.

Permit considerations for dock construction in Davis Shores

Dock permitting in Northeast Florida typically involves several reviewing agencies at once, and length, footprint and configuration are all subject to review. There is no value in designing something that cannot be approved.

Low elevation and proximity to a historic district bring considerations beyond the ordinary marine review path, and work on the Matanzas and the ICW carries navigation review. Local requirements here are worth confirming early.

Requirements are revised periodically. Treat this as orientation and confirm current requirements with each reviewing agency before planning work. We handle permitting on the projects we build, and agency review is normally the longest item in the schedule.

Filter the full gallery by neighborhood, county and project type.

View all projects

Barefoot Marine's own job photography from across Northeast Florida.

Davis Shores dock construction questions

How much does a bulkhead cost in Davis Shores?
If you are pricing a dock alongside the wall, there is no honest per-foot figure for Davis Shores, because the variables that move the number are site-specific. The ones that matter most here: retained height, the soils (filled ground over original marsh and river bottom. The organic layers beneath the fill are a central engineering fact here: they provide little resistance, and embedment has to reach past them. Settlement over time is common on properties where it did not), whether a driveway, pool deck or structure is adding surcharge behind the wall, and access. Land access is generally workable, but lots are compact and densely developed, with limited laydown space and hardscape close to the water. Protecting and restoring what is in the work corridor is a real part of the scope. If you are pricing a dock and a wall together, doing both in one mobilisation is normally cheaper than two separate projects. Our estimates are free and written against your actual frontage.
How much does a seawall cost in Davis Shores?
If you are pricing a dock alongside the wall, a seawall generally costs more than a bulkhead of the same length on the same site, because it carries work the bulkhead does not: toe protection sized for the exposure, deeper embedment with a scour allowance, and a heavier section for wave loading. On Davis Shores frontage, moderate exposure — not extreme, but persistent enough to matter over a structure’s life, which is what drives that difference. Demolition of an existing wall and permitting are the other two line items worth stated explicitly rather than discovered later.
How long do seawalls last in Florida?
There is no single number — drainage, toe protection and tieback corrosion decide it far more than the material does. In Davis Shores, full salt exposure accelerates corrosion of hardware and embedded reinforcement, which shortens the clock for any given specification. The full answer is here.
Do I need permits for a dock in Davis Shores?
If you are pricing a dock alongside the wall, assume yes, and often from more than one agency. Low elevation and proximity to a historic district bring considerations beyond the ordinary marine review path, and work on the Matanzas and the ICW carries navigation review. Local requirements here are worth confirming early. Depending on your site and scope that can involve FDEP, the U.S. Army Corps of Engineers, the St. Johns River Water Management District, and your county or municipal building department. Requirements are revised periodically — confirm current requirements with the reviewing agency. Our dock permits page explains who reviews what, and we handle permitting on the projects we build.
Can a seawall be repaired?
Usually — repair is a fraction of replacement when the piles, embedment and tiebacks are still sound. What that looks like in Davis Shores.
What causes bulkhead failure?
Soil loss through joints, tieback corrosion, toe scour, and chloride attack on the cap — usually several at once. How that plays out in Davis Shores.
What is the best bulkhead material?
No single best — for most Davis Shores frontage, tied-back vinyl is the starting point, with concrete where surcharge load is real. Material choice for Davis Shores.
What is the best seawall material?
Whatever the material, the section has to suit wave loading and the toe has to be protected — neither concrete nor vinyl resists scour on its own. What suits Davis Shores.

Nearby waterfront communities

We work the whole of this stretch. Conditions change between these communities — sometimes a lot.

Last reviewed November 2026 by Barefoot Marine Construction. Permit requirements and agency rules change — confirm current requirements with the reviewing agency before planning work.

Dock Construction in Davis Shores — free estimate

We work St. Johns County waterfront from our base in Jacksonville. Tell us what you are seeing and we will tell you what it needs.

Certified General Contractor #1533461 · Workers' Comp + USL&H Insured · Serving Northeast Florida since 2009