Marsh Landing · St. Johns County, Florida

Seawall Construction in Marsh Landing

Seawalls built for the energy of Marsh Landing's frontage on the Intracoastal Waterway.

  • Intracoastal Waterway
  • tidal marsh creeks

Barefoot Marine Construction builds and repairs the structures that hold Marsh Landing's waterfront in place. We have worked St. Johns County since 2009 — Certified General Contractor #1533461, carrying Workers' Compensation and USL&H coverage — the federally required cover for maritime work that falls outside state workers' compensation, and the one that actually applies to crews working over water.

This page is about seawall construction specifically in Marsh Landing, on the Intracoastal Waterway. The engineering here is not the same as it is five miles away, and an estimate written without knowing which water your property faces is a guess.

Marsh Landing at the water's edge

A seawall is designed around the energy it absorbs, so the design starts with the water rather than with the wall.

Marsh Landing is a gated community in Ponte Vedra Beach built around tidal marsh and a marina on the Intracoastal. The name is accurate: a large share of the waterfront here is marsh frontage rather than open water, and that single fact drives most of the marine construction decisions inside the community.

Frontage ranges from direct Intracoastal exposure near the marina to deep marsh frontage where the upland edge sits well back from navigable water. Many properties look out over spartina rather than open water, with a long walkway reaching across the marsh to a terminal platform.

What the water does here

Marsh frontage is low-energy by nature — the grass absorbs wave energy before it reaches the bank, which is exactly what it is for. The energy that matters here is tidal current moving through the creeks, and boat wake on the properties close to the ICW and the marina approach.

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. Tidal range is significant. That matters twice over: it drives a large volume of water in and out through any opening in a wall, and it makes a fixed-only dock awkward to board at the bottom of the tide.

Marsh soils with significant organic content over sand, and considerable variation in depth to competent bearing. This is the governing constraint on pile work inside Marsh Landing: piles frequently have to go well past the organics to find capacity, and that drives both design and cost. For a seawall it drives section selection, how much toe protection the wall needs, and where the cap has to sit to limit overtopping.

Common shoreline problems in Marsh Landing

A new seawall on Intracoastal Waterway and tidal marsh creeks has to answer all of these. The ones involving scour and overtopping are the ones most often left out of a cheap design.

  • Bank undercutting along tidal creeks where current runs hardest on the outside of bends
  • Loss of marsh fringe where it was cleared or has retreated, removing the buffer that was protecting the bank
  • Settlement of structures founded in organic soils that were not penetrated adequately
  • Soil loss behind older walls on the ICW-facing properties
  • Scour around dock piles where creek current concentrates

Designing a seawall for Marsh Landing conditions

A seawall is designed around the energy it has to absorb, and that is why we will not quote one by the foot over the phone. Marsh frontage is low-energy by nature — the grass absorbs wave energy before it reaches the bank, which is exactly what it is for. The energy that matters here is tidal current moving through the creeks, and boat wake on the properties close to the ICW and the marina approach.

On Marsh Landing frontage that drives four things: the section selected, how deep it is embedded, whether toe protection is needed and how much, and where the top of the wall sits relative to design water levels.

  • Fetch and wake exposure specific to your frontage on the Intracoastal Waterway
  • Embedment depth, with an allowance for scour rather than for soil load alone
  • Toe protection sized for the energy the wall will reflect back into the water
  • Cap elevation and freeboard, set to limit overtopping
  • Tieback spacing and anchor placement outside the active soil wedge

Toe protection is the detail that decides it

A vertical wall reflects wave energy downward into the water at its own base, and that reflected energy excavates the material the wall is embedded in. The wall undermines its own foundation, continuously, and none of it is visible from the top.

True seawall conditions in Marsh Landing are limited to the properties with direct Intracoastal exposure near the marina approach, where wake is a genuine load. Elsewhere, specifying a heavy wave-resisting wall for a marsh-fronted lot is paying for capacity the site will never ask for.

If you are comparing estimates for Marsh Landing and one of them has no toe protection on exposed frontage, that is the question to ask before you compare the totals.

Materials for this water

Full salt exposure. Hardware, fasteners and embedded reinforcement all corrode faster here than on the fresher inland reaches, so specification is a service-life decision rather than a detail. We build vinyl and concrete seawalls, and the choice turns on exposure, what sits behind the wall, and how long you intend to own the property.

The important qualifier for vinyl is that wave loading is a larger demand than soil retention, so the section has to be selected for it. A profile adequate on sheltered water is not automatically adequate here. The full construction process is here.

Bulkhead concerns in Marsh Landing

A new seawall here is also a soil-retaining structure, so the bulkhead side of the problem does not go away. Bulkheads inside Marsh Landing are mostly working on the upland edge rather than facing open water, which means they are soil-retention structures in the truest sense. Full detail: bulkhead construction in Marsh Landing and bulkhead repair.

Dock challenges in Marsh Landing

A new wall is the natural moment to resolve a dock tie-in properly rather than working around it. The constraints on this frontage:

More at dock construction in Marsh Landing.

  • Long walkways across marsh to reach navigable depth, which dominates dock cost here
  • Organic soils requiring deeper pile penetration to find bearing
  • Regulated marsh with submerged resources shaping where a structure can go

What we would recommend in Marsh Landing

Putting that together for a new seawall here:

Marsh frontage usually points towards a stabilisation approach on the bank plus a properly engineered dock walkway, rather than a hard wall. For the ICW-exposed properties near the marina, a tied-back wall with toe protection is the right answer. The marsh is doing useful work — removing it to install a wall is often a step backwards.

Gated access, mature landscaping and marsh between the upland and the water all constrain how equipment reaches the work. Marsh frontage in particular frequently means working from the water, because there is no way to get a machine across the grass without doing damage that is both expensive and regulated.

Permit considerations for seawall construction in Marsh Landing

A new seawall is reviewed as new construction, and the toe protection it needs is part of the proposal rather than an afterthought added later.

Marsh is regulated shoreline, and work affecting it is reviewed more closely than work on an already-armoured upland edge. The extent of marsh between your upland and navigable water shapes both what is permittable and how long review takes.

Requirements are revised periodically. Treat this as orientation and confirm current requirements with each reviewing agency before planning work. We handle permitting on the projects we build, and agency review is normally the longest item in the schedule.

Filter the full gallery by neighborhood, county and project type.

View all projects

Barefoot Marine's own job photography from across Northeast Florida.

Marsh Landing seawall construction questions

How much does a bulkhead cost in Marsh Landing?
It depends on retained height, soils, what is loading the ground behind the wall, and how equipment reaches the water — and in Marsh Landing, access is a genuine swing factor. Full breakdown for Marsh Landing, or the general bulkhead cost page. Estimates are free.
How much does a seawall cost in Marsh Landing?
Designing a new seawall, a seawall generally costs more than a bulkhead of the same length on the same site, because it carries work the bulkhead does not: toe protection sized for the exposure, deeper embedment with a scour allowance, and a heavier section for wave loading. On Marsh Landing frontage, moderate exposure — not extreme, but persistent enough to matter over a structure’s life, which is what drives that difference. Demolition of an existing wall and permitting are the other two line items worth stated explicitly rather than discovered later.
How long do seawalls last in Florida?
Designing a new seawall, the answer is a range rather than a number — two walls built the same week in the same material can be decades apart. What decides it: toe protection and whether scour was allowed for, drainage behind the wall, corrosion protection on the tieback hardware, and whether anyone has looked at it in the last five years. In Marsh Landing specifically, full salt exposure accelerates corrosion of hardware and embedded reinforcement, which shortens the clock for any given specification. More on what actually determines it.
Do I need permits for a dock in Marsh Landing?
Yes, and usually from several agencies at once. Marsh is regulated shoreline, and work affecting it is reviewed more closely than work on an already-armoured upland edge. Dock permitting in Marsh Landing, or who reviews what. Confirm current requirements with the reviewing agency.
Can a seawall be repaired?
Usually — repair is a fraction of replacement when the piles, embedment and tiebacks are still sound. What that looks like in Marsh Landing.
What causes bulkhead failure?
Soil loss through joints, tieback corrosion, toe scour, and chloride attack on the cap — usually several at once. How that plays out in Marsh Landing.
What is the best bulkhead material?
No single best — for most Marsh Landing frontage, tied-back vinyl is the starting point, with concrete where surcharge load is real. Material choice for Marsh Landing.
What is the best seawall material?
The same honest answer, with one addition specific to seawalls: whatever material you choose, the section has to be selected for wave loading rather than for soil retention, and the toe has to be protected. Marsh Landing frontage sees moderate but persistent energy, so this matters over the life of the wall rather than on any single day. Concrete brings mass and stiffness; vinyl cannot corrode. Neither protects against scour on its own.

Nearby waterfront communities

We work the whole of this stretch. Conditions change between these communities — sometimes a lot.

Last reviewed November 2026 by Barefoot Marine Construction. Permit requirements and agency rules change — confirm current requirements with the reviewing agency before planning work.

Seawall Construction in Marsh Landing — free estimate